About Us
INTA brings together expertise in the planning and execution of piling and foundation works. We construct piled foundations and excavation support systems, including bored piles, sheet pile walls, steel tubular pile walls, ground anchors and micropiles.
Our practical experience and company-owned equipment fleet enable us to undertake projects across a wide range of sectors. Our approach is built on technically sound solutions, transparent commercial terms and a firm commitment to meeting our obligations.
Our Services
  • Piling Works
    • Cased bored piles.
    • Continuous Flight Auger (CFA) piles
    • Full Displacement Piles (FDP / DDS), installed without soil excavation.
  • Piled Excavation Support
    • Secant pile walls.
    • Contiguous pile walls.
    • Soldier pile walls using steel tubular piles with lagging.
    • Vibratory installation of steel tubular piles.
    • Installation of walers and strutting systems.
  • Sheet Pile Walls
    • Installation of steel sheet pile walls, including Larssen sheet piles.
    • Vibratory installation and extraction of sheet piles.
    • Installation of walers, struts and tie-back anchoring systems.
  • Ground Anchors
    • Temporary and permanent ground anchors.
    • Bar and strand anchors.
    • Self-drilling hollow-bar injection anchors.
    • Anchor grouting, stressing and testing.
  • Minipiles and Micropiles
    • Small-diameter bored piles.
    • Drilled and grouted micropiles.
    • Self-drilling hollow-bar micropiles.
    • Vertical and inclined micropiles.
    • Underpinning and strengthening of existing foundations.
    • Installation using compact drilling rigs.
  • Pile Caps and Foundation Structures
    • Cast-in-place reinforced concrete pile caps.
    • Raft foundations.
    • Reinforcement and formwork.
    • Concreting of foundation structures.
    • Pile head preparation and connections to pile caps.
Why Choose Us
  • Our Own Equipment Fleet
    We operate our own fleet of drilling rigs and support equipment for piling and foundation works. We select equipment to suit the ground conditions, project specifications and site constraints.
  • Over 70 Completed Projects
    We have completed more than 70 piling and foundation projects across various regions of Russia. This experience enables us to address project-specific requirements and organise site operations efficiently.
  • 20 Years in the Industry
    Our experience in piling and foundation works enables us to assess the specific requirements of each project, select suitable construction methods and organise delivery in line with project specifications.
Recently Completed Projects
  • Client: NOVATEK

    Main Contractor: Himstalcon Engineering LLC

    Project: Terminal for the Transshipment of Stabilised Gas Condensate and Petroleum (Murmansk)

    Works completed: Installation of 1200 mm diameter bored piles

    Quantity: 446 m³

    Execution Period: July — September 2026

  • Client: STANKOLIT Group JSC
    Contractor: ATAK Engineering LLC
    Project: Office Complex at STANKOLIT Business Park, Block 5, Skladochnaya Street, Moscow
    Works completed: Vibratory installation of 530 mm diameter steel tubular piles.
    Quantity: 2952 linear metres.
    Execution Period: October — December 2025
  • Client: Fodd JSC
    Project: Nicole – Luxury Residential Development near the Kremlin, Moscow
    Works completed: Installation of 1,000 mm diameter bored piles.
    Quantity: 988 m³
    Execution Period: March — June 2025
  • Client: OSNOVA LLC
    Project: Office Building at 17, 1st Yamskogo Polya Street, Moscow
    Works completed: Installation of 800 mm and 750 mm diameter bored piles.
    Quantity: 309 m³.
    Execution Period: July 2024
CONTACT US
+7 (968) 069-67-07
info@intacons.com
© 2026 INTACONS Group
Pile and Foundation Works
Made on
Tilda